Installation of a new, pre-engineered rail bound equipment inspection building which will feature a track inspection pit, where PATH employees can inspect rail bound equipment efficiently. Installation of a new storm water detention system that will limit the flow of rainwater collected from being released into the environment and mitigate flooding found in the yard. Additional new utilities were installed consisting of HVAC equipment, electrical wiring, communication, plumbing, and fire protection. Approximately 1,450 TF of new 115RE Rail on concrete ties and two new no. 4 turnouts installed.
-
-
-
-