Removal and replacement of 3,300’ of track and turnouts. An additional 1,300’ of new track was installed consisting of new bumpers, rail, and concrete ties. Constructed 6 new turnouts, 1 new crossover, and relocated 2 existing turnouts. Installed 5 new Star Track concrete grade crossings for construction of 1,000’ of new access road. Raise, line, and tamp track and turnouts to new configuration. Installed 19 new light poles and fixtures throughout the yard as well as new drainage along the track. All work performed during active rail yard.
-
-
-
-