Construction of two (2) new #8 turnouts and 1790 TF of new railroad track consisting of wood ties, double shoulder tie plates, and 115RE rails. Installation of three (3) new WCH bumping posts. Construction of new 440ft long warehouse to railcar loading dock. Installation of 1814 LF of new heavy duty precast trench train adjacent new tracks. Excavation, grading and export of 3000 tons of soil. Construction of 120,000 SF new concrete pavement. All work performed without interruption to 24/7 operating warehouse.
-
-
-
-